Work-Station (m) | Tasks assigned for each workstation | Station Time (min.) | Idle Time (min.) |
1 | 1,2,3,4,5 | 77.53 | 74.80 |
2 | 6,7,8,9,10,11,12 | 86.45 | 65.88 |
3 | 13,14,15,16,17,18,19,20,21,22,23,24,25,26,27, 28,29,30,31,32,33,34,35,36,37 | 73.19 | 79.14 |
4 | 38,39,40,41,42,43 | 119.35 | 32.98 |
5 | 44,45,46,47,48,49,50,51,52,53,54,55,56,57,58,59,60,61,62,63 | 103.11 | 49.22 |
The total idle time (Tid) = 303.02 min., The workload variance (wv) = 293.09, The line efficiency (E) = 77.02%. |